Chances and Risks in Construction Management and Economics: A Systemic Approach to Dealing with Models and Uncertainties
暫譯: 建設管理與經濟中的機會與風險:系統性處理模型與不確定性的方法
Hofstadler, Christian, Kummer, Markus
- 出版商: Springer
- 出版日期: 2021-06-21
- 售價: $7,180
- 貴賓價: 9.5 折 $6,821
- 語言: 英文
- 頁數: 696
- 裝訂: Hardcover - also called cloth, retail trade, or trade
- ISBN: 3030640132
- ISBN-13: 9783030640132
-
相關分類:
經濟學 Economy
海外代購書籍(需單獨結帳)
商品描述
The book outlines the processes of calculating and critically reviewing construction costs and times for clients and contractors in different project phases. Any project or structural analysis should yield accurate information on times, costs, and prices. The related database is more or less uncertain depending on project complexity and the circumstances of work performance. It is thus recommended to use ranges of key input parameters. This approach consistently considers uncertainties within a holistic project view, thus enhancing the plausibility and validity of specific values. Only the integration of probabilistic methods will allow for calculating and graphically representing the chance/risk ratio as a crucial project variable ultimately influencing the entire business.
This book examines the systemic modeling and consideration of uncertainties when determining construction costs and times, and life-cycle costs. It contains detailed descriptions of other decision-making processes, including project preparation and planning (developer calculation, soil survey, cost estimate), work preparation (costing, pricing, construction time evaluation, resource identification, comparison of construction methods, bid analysis, contract award), and project execution (site logistics, construction method selection, construction process planning, work coordination, sourcing, determination of additional costs, trend analyses), as well as for project portfolio management as a tool relevant to all phases.
商品描述(中文翻譯)
本書概述了在不同專案階段中,為客戶和承包商計算及批判性審查建設成本和時間的過程。任何專案或結構分析都應提供有關時間、成本和價格的準確資訊。相關的數據庫根據專案的複雜性和工作執行的情況,可能會有或多或少的不確定性。因此,建議使用關鍵輸入參數的範圍。這種方法始終考慮到整體專案視角中的不確定性,從而增強特定值的合理性和有效性。只有整合概率方法,才能計算並圖形化表示機會/風險比率,這是最終影響整個業務的關鍵專案變數。
本書探討了在確定建設成本和時間以及生命週期成本時的系統建模和不確定性考量。它詳細描述了其他決策過程,包括專案準備和規劃(開發者計算、土壤調查、成本估算)、工作準備(成本計算、定價、建設時間評估、資源識別、建設方法比較、投標分析、合同授予)以及專案執行(現場物流、建設方法選擇、建設過程規劃、工作協調、採購、額外成本的確定、趨勢分析),還有專案組合管理作為與所有階段相關的工具。
作者簡介
Prof. Christian Hofstadler is the Head of the Institute of Construction Management and Economics at Graz University of Technology (TU Graz) in Austria. In his role, he constantly strives to optimize the way in which knowledge is transferred on a sound and sustainable basis in university tuition and research to the benefit of the community of experts in both the private and the public sector. His endeavor has always been to generate and transfer networked knowledge and the associated know-why. His research findings are not only presented in tuition and research, they are also put to good use by construction practitioners in their daily work.
Dr. Markus Kummer graduated from TU Graz, obtaining a master's degree in industrial engineering/construction engineering sciences. Since 2011 he has been working as an independent professional, preparing expert opinions in the field of construction management and economics. Since 2013he has also been university project assistant at TU Graz, followed by a senior project scientist position at the Institute of Construction Management and Economics. He is the deputy head of the working group on the "Management of Chances and Risks, and Digitization" and is a member of the Institute Board. He has authored several articles in the construction engineering sciences field as well as co-hosted scientific conferences.
作者簡介(中文翻譯)
教授Christian Hofstadler是奧地利格拉茨科技大學(TU Graz)建設管理與經濟學研究所的所長。在他的角色中,他不斷努力優化知識在大學教學和研究中的傳遞方式,以便在私營和公共部門的專家社群中實現可持續的利益。他的努力始終是生成和傳遞網絡化的知識及其相關的「知為」。他的研究成果不僅在教學和研究中展示,還被建築實務者在日常工作中充分利用。
博士Markus Kummer畢業於TU Graz,獲得工業工程/建設工程科學的碩士學位。自2011年以來,他一直作為獨立專業人士工作,準備建設管理和經濟學領域的專家意見。自2013年起,他也擔任TU Graz的校內專案助理,隨後在建設管理與經濟學研究所擔任高級專案科學家。他是「機會與風險管理及數位化」工作組的副組長,並且是研究所董事會的成員。他在建設工程科學領域撰寫了多篇文章,並共同主辦了科學會議。